High-Rise and Super High-Rise
New-Build Main Structure Concrete Pouring and Exterior Wall Treatment
For new high-rise construction covering main-structure concrete pouring and exterior wall treatment, this solution matches exterior scaffold, internal formwork/support and facade finishing products across top non-standard floors, middle standard floors, podium or garage open floors, and basement areas.
Category
High-Rise and Super High-Rise
| Construction Scope | External Scaffold Product Selection | Internal Formwork Product Selection | Exterior Insulation Decoration Treatment |
|---|---|---|---|
| Top non-standard floors | Cantilever scaffolding Ringlock scaffolding Cuplock scaffolding Frame / tube scaffolding | Timber formwork + 48-series ringlock system | Foamed-ceramic integrated insulation decorative panels |
| Middle standard floors | Climbing scaffold systems Hot-dip galvanized electric-hoist climbing scaffold | Steel props + high-strength alloy steel formwork | |
| Podium, garage and open floors | Ringlock scaffolding | Ringlock support + timber formwork Ringlock support + steel formwork | |
| Basements | N/A | Ringlock support + timber formwork Ringlock support + steel formwork |